TDA025 Hand Crank Screw Replacement

 

TDA025 Hand Crank Screw Replacement 

  1. Turn length adjustment screw out so that cutting head falls away from turntable.
  2. Run machine until head stops at bottom of cycle.
  3. Turn unit over and remove 4 screws that hold the top to the base.
  4. Remove top from base by pressing down on the tape holder arm and pushing up at an
    angle under the turntable directly across from the tape holder arm.
  5. Remove #62 screw from gear cover and remove #61 Gear Cover.
  6. Locate torsion spring on #68 Lever and make sure it is tensioned correctly.
  7. When set correctly, the metal piece will engage with #59 Gear.
  8. Replace gear cover and screws.
  9. Replace top on machine. Use caution not to bend fan blades. Also, the slot on #3 must
    be aligned to fit over the spring-loaded arm that is attached to the turntable
    adjustment knob.
  10. Replace 4 screws that hold top onto base.

Leave a Reply

Your email address will not be published. Required fields are marked *

Translate »